Client: FlexPipe Systems

Contract Overview
Start Date: August 2015
End Date: December 2016
Contract Value: $400,000 – $600,000

Sub-Contractors & Project Roles

TNA Concrete, Concrete Pads and Bases for Equipment

Eagle Masonry, Construct Switch Gear Blast Room

MCR Crane and Rigging, Place Equipment in Place.

Scope of Work

  • Install 4000amp distribution switch gear
  • Trench and Install duct bank
  • Pull and terminate 15kv cable
  • Install a 3.5mva transformer
  • Drill piles at 6 meter’s for a pour in place transformer pad
  • Pull 750kcmil copper conductors
  • Test low and high voltage cables
  • Design a blast proof concrete switch gear room
  • Perform as General Contractor, working directly for Platinum Engineering and FlexPipe Systems